The qualification for general contracting of water conservancy and hydropower projects can be divided into super, first, second and third levels.
3.1
First-class qualification standard
3.1.1 Enterprise assets
The net asset is more than 100 million yuan.
3.1.2 key personnel of the enterprise
(1) there are not less than 15 first-class registered builders in water conservancy and hydropower engineering.
(2) the technical person-in-charge has more than 10 years of experience in engineering construction technical management, and has senior professional titles related to water conservancy and hydropower engineering; there are not less than 60 personnel with intermediate professional titles related to water conservancy and hydropower engineering.
(3) there are not less than 50 construction site management personnel holding post certificates, and the construction staff, quality staff, safety staff, material staff, material staff and other personnel are complete.
(4) not less than 70 skilled workers at or above the intermediate level who have passed the examination or training.
3.1.3 Enterprise Engineering performance
In the past 10 years, he has undertaken the construction general contracting or main project contracting of 3 of the following 7 categories of projects, including at least 1 category of category 1 and 2 and at least 1 of category 3 and 5, and the quality of the project is qualified.
(1) two reservoirs and hydropower stations with a reservoir capacity of more than 50 million cubic meters and a dam height of more than 15 meters or more than 10 million cubic meters and a dam height of more than 50 meters
(2) 4 sluices with ≥ 500m3 / s (excluding rubber dams, etc.)
(3) 2 hydropower stations with total installed capacity above 100MW
(4) 2 pumping stations with total installed capacity 5MW (or flow rate ≥ 25 cubic meters / s) or above
(5) 4 hydraulic tunnels with a diameter of ≥ 6m (or other type with the same cross-sectional area) and a length of ≥ 500m
(6) more than 500000 cubic meters of hydraulic concrete or more than 1.2 million cubic meters of earth and rock filling of the dam or more than 120000 meters of grouting or more than 80 000 square meters of impervious walls will be completed every year.
(7) Water conservancy and hydropower projects with a single contract value of more than 100 million yuan.
3.2
Second-level qualification standard
3.2.1 Enterprise assets
The net asset is more than 40 million yuan.
3.2.2 key personnel of the enterprise
(1) there shall be not less than 15 registered builders for water conservancy and hydropower projects, of which not less than 6 are first-class registered builders.
(2) the technical person-in-charge has more than 8 years of experience in engineering construction technical management, and has the senior professional title of water conservancy and hydropower engineering or the professional qualification of first-class registered architect in water conservancy and hydropower engineering; there are not less than 30 people with intermediate or above professional titles related to water conservancy and hydropower engineering.
(3) there are not less than 30 construction site management personnel holding post certificates, and the construction staff, quality staff, safety staff, material staff, material staff and other personnel are complete.
(4) not less than 40 skilled workers at or above the intermediate level who have passed the examination or training.
3.2.3 Enterprise Engineering performance
In the past 10 years, he has undertaken the construction general contracting or main project contracting of 3 of the following 7 categories of projects, including at least 1 category of category 1 and 2 and at least 1 of category 3 and 5, and the quality of the project is qualified.
(1) two reservoirs and hydropower stations with a reservoir capacity of more than 5 million cubic meters and a dam height of more than 15 meters or more than 100000 cubic meters and a dam height of more than 30 meters
(2) 4 sluices with a flow rate of 60 m3 / s (excluding rubber dams, etc.)
(3) 2 hydropower stations with total installed capacity above 10MW
(4) 2 pumping stations with total installed capacity 500KW (or flow rate ≥ 8 cubic meters / s) or above
(5) three hydraulic tunnels with a diameter of 4m ≥ (or other type with equal cross-sectional area) and a length of 200m ≥
(6) complete more than 200000 cubic meters of hydraulic concrete pouring or more than 600000 cubic meters of earth and rock filling of the dam or more than 60, 000 meters of grouting or more than 40, 000 square meters of impervious wall
(7) Water conservancy and hydropower projects with a single contract value of more than 50 million yuan.
3.3
Third-level qualification standard
3.3.1 Enterprise assets
The net asset is more than 8 million yuan.
3.3.2 key personnel of the enterprise
(1) not less than 8 registered builders specializing in water conservancy and hydropower projects.
(2) the technical person-in-charge has more than 5 years of experience in engineering construction technical management, and has the professional title of intermediate or above in the relevant major of water conservancy and hydropower engineering or the professional qualification of registered architect of water conservancy and hydropower engineering; there are not less than 10 people with intermediate or above professional titles in the relevant majors of water conservancy and hydropower engineering.
(3) there are not less than 15 construction site management personnel holding post certificates, and the construction staff, quality staff, safety staff, material staff, material staff and other personnel are complete.
(4) not less than 20 skilled workers at or above the intermediate level who have passed the examination or training.
(5) the technical person-in-charge (or registered architect) has presided over the completion of not less than 2 projects required by the qualification level 2 or above in this category.
3.4
Scope of contracted project
3.4.1 first-tier qualification
Can undertake the construction of various types of water conservancy and hydropower projects.
3.4.2 second-level qualification
It can undertake the construction of water conservancy and hydropower projects below medium scale and hydraulic structures below building level 3, but the following projects are limited to the following scope: dam height below 70 m, total installed capacity of hydropower station below 150MW, hydraulic tunnel diameter less than 8 m (or other types with equal cross-sectional area) and length less than 1000 m, dike level 2 below.
3.4.3 level III qualification
Can undertake the construction of the following water conservancy and hydropower projects with a single contract value of less than 60 million yuan: the general contract for the construction of water conservancy and hydropower projects below type (1) and hydraulic structures below building level 4 However, the following projects are limited to the following areas: dam height less than 40m, total installed capacity of hydropower station less than 20MW, total installed capacity of pumping station less than 800KW, diameter of hydraulic tunnel less than 6m (or other types with equal cross-sectional area) and length less than 500m, dike level 3 below.
Note:
1. Water conservancy and hydropower projects refer to all kinds of projects (including supporting and ancillary projects) aimed at flood control, irrigation, power generation, water supply, waterlogging control, water environment control, etc. The main engineering contents include: construction of hydraulic structures (dams, dikes, sluices, spillways, hydraulic tunnels, culverts and culverts, intake structures, river regulation buildings, canal system buildings, navigation, wood, fish structures, foundation treatment) construction, hydropower station construction, pump station construction, hydraulic machinery installation, hydraulic metal structure manufacturing and installation, electrical equipment installation, automatic information system, environmental protection engineering construction, Construction of soil and water conservation project and land renovation project As well as the construction of roads, bridges, communications, hydrology, well drilling and other projects related to flood control and drought relief, and the construction of ancillary projects related to the above-mentioned projects, please refer to the Technical terminology Standard of Water Conservancy and Hydropower Engineering (SL26-2012).
two。 The grade of water conservancy and hydropower projects is determined according to the Classification of Water Conservancy and Hydropower projects and Flood Standard (SL252-2000).
3. Professional titles related to water conservancy and hydropower engineering include water conservancy and hydropower engineering construction, water conservancy engineering construction, farmland water conservancy engineering, hydropower station power equipment power system and automation, hydraulics and river dynamics, hydrology and water resources, engineering geology and hydrogeology, water conservancy machinery, etc. Professional titles related to water conservancy and hydropower.